Projects Executed by Company


S.NO ORGANIZATIONS DESIGNATION DURATION PROJECT
1 Site Plan Engineers, Chennai. Project Manager Since Oct 2008 VRV India Cryogenic Equipment Pvt Limited.
Tada .AP
View Photos
2 Site Plan Engineers, Chennai. Project Manager June 2007 to Aug 2008 Wabco-TVS Mahindra City, Chennai.
View Photos
3 Site Plan Engineers, Chennai. Project Manager - Hitech Plast limited,Sriperumbudur.
View Photos

Details of Work Experience - Kannan


S.NO ORGANIZATIONS DESIGNATION DURATION PROJECT
1 Wilbur Smith Associates, Bangalore. Team Leader April 2007 to June 2007 Volvo Bus Body Technologies. Bangalore.
View Photos
2 Lucas TVS Limited,Pondicherry. Senior Engineer July 2006 to March 2007 Lucas- TVS Limited. Pondicherry.
3 Semac Private Limited, Hyderabad. Project Manager Nov 2003 to June 2006
  • Sundaram Clayton limited.Chennai.
  • Hitech Plast limited.
  • India gypsum limited. Banglore.
4 Sri Mythili Engineering, Chennai. Project Engineer Jan 2003 to Oct 2003
  • Golden Distilleries ltd, Chennai.
  • Doubling of Railway Track ,Rajampeta (A.P)
5 Nagarjuna Constructions, Chennai. Junior Engineer Oct 1999 to Dec 2002
  • Mahindra World City Near Chennai.
  • Highway Bridges, Chengalpattu.
6 Master Plan Architects, Chennai. Project - In charge July 1998 to Oct 1999 Ford India Limited. Chennai.
7 Carmel Engineers, Madurai. Site Engineer June 1994 to June 1998
  • Residential Houses Madurai.
  • Highway Dept. Madurai.
  • Irrigation Works, Madurai.

Details of Work Experience - Balasubramaniam


S.NO ORGANIZATIONS DESIGNATION DURATION PROJECT
1 SEMAC Private Limited Head of Department for Mechanical Department March 2005 till April 2011 Designing of
  • Fire Hydrant, fire Detection and Sprinklers system as per NBC,TAC and NFPA
  • Plumbing, sanitary, water supply systems as per NBC
  • Water treatment plants for portable and process waters
  • Sizing of all Utility Equipments and pipings
  • Pipe rack layout design
  • Fuel storage and transfer system
  • Above ground and Underground storage tanks as per AP1650 Design code based on the NFPA requirements
  • Layout of water tanks and pump room
  • Design and selection of various types of pumps
  • Effluent treatment plant and Effluent piping
  • STP
  • BMS-Access controls, CCTV security systems
  • Automation
2 SEMAC Private Limited Mechanical Project Incharge Jan 2004 - Feb 2005 Responsible for design Detailed Engineering, Erection and commissioning;
  • Fire Hydrant, fire Detection and Sprinklers system as per FM Global
  • Utility Equipments like steam boilers, air compressor, DG sets, Water Treatment plant and Utility pipings, LPG Gas Bank and piping system, STP and Kitchen Equipments.
3 SEMAC Private limited Detailed Engineering, Erection ,commissioning and Testing for COCO-COLA Project at Sri kalahasthi. Jan 2003 - Dec 2003
  • Steam boilers, DG sets,Air compressors of 7-bar and 40 bar pressure and other equipment in project.
  • Total plant piping for steam, chilled water (Glycol), and Compressed air and Treated water lines.
4 DALAL MOTT MAC DONALD PVT LTD Worked at salve vishnu BARIUM private Ltd, a Barium carbonate manufacturing unit. June 2001 - Dec 2002
  • Erection, testing and commissioning of process equipments, process piping, utility piping and scada control system
5 Le-Royal Meridian, Chennai Deputy Chief Engineer Aug 2000 - May 2001 Responsible for operation and Maintenance of the following,
  • H.V.A.C system consisting of centrifugal chillers (350 TR*3) Yorke make, pumps, cooling towers AHU's and FCU's
  • 600 Kg/hours Steam boilers *3 no.
  • Centralized
    • - hot water
    • - Treated water
    • - LPG system.
  • Diesel Generators 1250KVA * 2 of caterpillar make.
  • Fire Fighting system
  • Kitchen and laundry Equipments.
  • Water treatment (RO) and sewage treatment plant
  • Swimming pool
  • Have installed and operated controlled Equipment and system through building automation system.
  • Have prepared planed preventive maintenance schedule for above equipments.
6 Worked at Chennai – Oberoi (for Hotel) Supervising of Erection and Commission Dec 1996 - Jul 2000
  • Centrifugal Chillers of 550 TR Capacities – 2No.
  • Vapour Absorption M/c of 550 TR capacities, Steam Boilers 3 ton/Hr
  • DG sets of 1500 KVA – 2No.
  • Hot water Generation – 3 no, 10 lakh liters
  • Water treatment plant
  • Fire Fighting and Plumbing services
For shopping,
  • Dg sets of 1000KVA – 2 no
  • Centrifugal Chillers of 375 TR -3 no, of central chilling plant.
7 Esquire Engineers and Consultants - Pepsi Co Ltd Engineering 1992 – 1996
  • Responsible for design details Engineering, Erection and Commissioning of Utility Equipment like Boilers, Chillers Compressors and its accessories
  • Main Bottling plant of 600 BPM capacity, Filling M/c, Washing m/c, steam, chilled water and Compressed Air Piping,
  • Mushroom plants of 3600 mt/annum capacity Sapthrishi Agro Industries Chennai, Transchem Ltd, Pune Alpine Ltd – Indore Consisting of 1550 TR inclusive of all accessories, hot and cool well cooling tower chilled water and condenser water pumps and air handling units -2 no, steam boilers of 5 ton/hr, cold storage and imported equipments.
8 Saudi Arabia - Water supply & Pumping Stations Erection & Commission 1990 – 1992
  • Power stations 4*1.5 m3 Diesel Generators – Blackstone with Heizman Electronic Governors,
  • Transfer pumps of 300 m3 capacities, vertical turbine pumps of 150 m3 capacities for Deep Well.
  • Power Stations & pumping Stations centrally controlled by Telemetry Cable System.
9 Nestle Boilers Pvt. Senior Engineer 1985 -1989
  • Erection and Commissioning of Oil Fired boilers upto 20 tonnes/hr Evaporating capacity,
  • Dual fuel fired burners of imported make, and coordinated services activates for boilers.
10 INDIAN NAVY Worked as chief – In charge on board naval ships up to 20000 HP and at Naval Dockyard. 1975 – 1985
  • On board ships responsible for operation and maintenance for main engines, boilers, chilling system, HP compressors, main propulsion unit, Turbo Generators and Diesel generators.
  • At Naval dockyard – Responsible for carrying out the maintenance and repair of ships scheduled for maintenance routine, overhauling of engines, pumps, generators and other equipments.
  • Dry dock – repair of ships preparation PERT chart and chief Incharge of planning department.